Unscheduled work is shown by different grouping methods

In the User Scheduling Board Setup there is an option to change the way how the unscheduled work is grouped. \

The user can set up the grouping method by:

  • none
  • planned date
  • work order priority
  • work order category
  • work type
  • asset location

After selecting the method - the scheduling board is updated.

Copyright Dynaway A/S

Privacy Policy