On the Asset Category Cart a field with maximum handout time (in days) is added. Field is enabled only when the Asset Type is set up as ** Tool.
This value will be automatically added to the asset card when the asset category will be chosen.
The value can be changed manually on the asset card.
Note: When the handout is being created, and parent is added with children - maximum handout time is calculated from the parent.