Add page to generate a report for LOTO details
Report will includes:
- details of LOTO
- description, assignee, created by, time period, functional location, and lockbox number
- plan lines, setup steps, and removal steps
- related work orders, assets, and functional locations
By pressing the button at the bottom it will be possible to download the report as PDF.