Possible to schedule with 0 hours

It is no longer possible save a duration of 0 hours on a schedule on the planning board.

!image-20200805-115001.png|width=565,height=196!

If the work order job is created without a forecast it is still possible, but a warning will be issued before saving the planning draft.